Evaluation of Land Preparation Scheduling in the Bunda Asri Housing Development Project Through the Precedence Diagram Method

Authors

  • Aldo Kasan Awali
  • Eka Rina Febriyani
  • Joko Yuwono

Keywords:

Evaluation, Land Preparation, Scheduling

Abstract

This research aims to evaluate the scheduling of land preparation in the Bunda Asri Housing Development Project using the Precedence Diagram Method. Through this approach, research analyzes the effectiveness and efficiency of scheduling activities such as land clearing, excavation, and other preparations. It is hoped that the results of this research will provide valuable insights for project management in optimizing resource use and accelerating construction schedules.

 

References

Andim Rendy S, TYMWN (2022). Analysis of Excavator and Dump Truck Heavy Equipment Production Capacity in Residential Land Preparation Work. 2(1), 20–29.

Basyar, AC, Nugroho, MW, Yulianto, T., & ... (2021). Productivity of International Floor Plate Work at Terminal 1 Juanda Airport, Surabaya. Scientific Journal…, 1(1), 23–32.

Bejasekto, S. (2020). Analysis of Productivity Needs for Heavy Equipment on the Road of Inspection Opas Indah. Final Analysis Project, 95. https://dspace.uii.ac.id/handle/123456789/12129

Deko Sanjaya & Syahrizal. (2014). Comparative Study of Line of Balance (Lob) and Precedence Diagram Method (Pdm) Project Scheduling on Repetitive Work (Case Study of the Maysa Tamansari Residence Housing Project).

Ir. Irika Widiasanti, MT & Lenggogeni, M. . (2013). Construction Management (Pipih Latifah (ed.); Print 1). Printed by PT Pemudan Rosdakarya Offset - Bandung.

Manumpil, TO, Mangare, JB, & Arsjad, TT (2022). Project Scheduling Analysis Using the PDM Method with the Time Reserve Concept in the Construction Project for the Police Doctor Building at Bhayangkara Hospital, Manado City. 20.

Putra, WR, Ridwan, A., Cahyo, Y., & Candra, AI (2020). Study of Time Acceleration Performance Implementation in the Dr. Hospital Blood Bank Building Construction Project. Soedomo. Journal of Technology Management & Civil Engineering, 3(1), 76. Https://Doi.Org/10.30737/Jurmateks.V3i1.892

Saskia, LN, Rio, WY, Damayanti, L., & Hum, M. (2020). Analysis of the Use of the Line of Balance Scheduling Method in Repetitive Construction Projects. Civil Engineering Final Project Journal, 4.

Utami, A. (2018). ANALYSIS OF PROJECT IMPLEMENTATION TIME SCHEDULING USING LSM METHOD (LINEAR SCHEDULING METHOD).

Widiasanti, I. And L. (2013). / 1 ' S7 ,. H.

Downloads

Published

2024-05-30