Analysis of Time and Cost Utilizing the Actual Cost Estimation Method Grounded on Field Productivity References
Keywords:
Analysis, Time and Cost, Actual Cost EstimationAbstract
This research aims to analyze project time and costs using the actual cost estimation method which is based on field productivity references. This method allows more accurate cost calculations by considering productivity factors that occur in the field. This study collects field data and integrates it into cost estimates, providing a better understanding of overall project performance.
References
Akbar, F., Yamali, FR, & Dwiretnani, A. (2021). Analysis of the Use and Productivity of Heavy Equipment in the Improvement Activities of the Simpang Pauh - Air Hitam Road Section, Jambi Province. Civil Talent Journal , 4 (2), 114. https://doi.org/10.33087/talentasipil.v4i2.57
Ardiansyah, R. (2020). Analysis of Rigid Pavement Thickness Planning for Replacement Lanes on the Jakarta-Cikampek II Elevated Toll Road Construction Project . 05 (01), 17–30. https://doi.org/10.29244/jsil.5.1.17-30
Handayani, E., & Akbar, F. (2020). Study of Heavy Equipment Productivity Efficiency on Road Projects (Case study: Mendalo Darat (Sp.Tiga)-Bts.Jambi City Road Section). Civronlit Unbari Journal , 5 (1), 16. https://doi.org/10.33087/civronlit.v5i1.63
Primayandhi, R. (2018). Study of Calculation of Heavy Equipment Requirements and Cost of Class A Aggregate Foundation Layer on Jalan Sepunggur-Gunung Tinggi Regency. Land of Spices. Journal of Civil Engineering , 2 (1), 47–55.
Sandi, F., Khamdari, E., & Pramono, E. (2019). Comparative Analysis of Unit Price Coefficients for AC-WC Resurfacing Work (Case Study: Jakarta – Bogor – Ciawi Toll Road and Jakarta – Cikampek Toll Road). National Seminar on Civil Engineering, Jakarta State Polytechnic .